Fast strength gain screed

Ideal in situations where ‘down time’ is not an option.

Rapid strength screeds mean keeping to strict programs.

We work with commercial and domestic clients in supplying and laying these screeds.  Commercial developments often require this kind of performance from their screed, needing to load the screed at a very early stage.  An example of the benefits of using fast strength-gain screeds would be a commercial project such a shop.  The requirement is often that a screed is to be laid with floor coverings in place as soon as possible, ready for the shops regular foot fall. Using a fast strength-gain screed means that the screeding element holds the programme up by less than 24 hours.

Heavy loading of the screed can only take place when the strength is sufficient to resist the load placed upon it, therefore rapid strength or accelerated screed is the answer.

During winter rapid strength screeds are often used to combat the low temperatures to ensure that work continues as normal, when traditional screeds strength gain slows.

Let Speed Screed provide the solutions to your site-based screeding problems.

Rapid strength screeds

fast strength gain screed, rapid strength screed, fast curing screed fast strength gain screed, rapid strength screed, fast curing screed

Get in Touch

info@speed-screed.com

Office Hours:

Monday to Friday 08.00 – 17.00

About Speed Screed

Speed Screed Limited was founded on the key principle of providing first-class customer service. It has since built itself an impressive reputation for delivering high-quality projects across the United Kingdom.
The company’s success is built on its belief in quality work, attention to detail, on-time completion, strong working partnerships and the recruitment of top-level staff. about us >

Rapid strength screeds

Rapid strength screeds