Derby Screed Site Survey – Gypsol HTC
This delightful renovation in Derby required a screed site survey to determine levels. The project had areas of underfloor heating, and the clients’ requirements were to keep the build-up as low as possible. Gypsol HTC requires only 20mm coverage over the underfloor heating pipes and is perfect for the project.
We love to help! Contact us.
Leave A Comment